PHASE 2 PROJECT PHOTOS – CONSTRUCTION PHOTOS

Installing platforms around Elev. 4-Stair -2 (3rd to 4th Floor) Facing South (800x600).jpg Layout from the Administration Building to the New Building pic -4 (800x600).jpg Layout from the Administration Building to the New Building pic -5 (800x600).jpg Pouring concrete at Elev. 5,6 (3rd Floor) Facing South-West (800x600).jpg Starting saw cutting Rahway Ave by the Administration building (800x600).jpg Welding beams at Derrick -3 (3rd Floor) Facing North (800x600).jpg Continued compacting and backfilling Cafeteria Room 104 Facing North (800x600).jpg Continued excavation for the underground sanitary piping Facing East (800x600).jpg Continued saw cutting Rahway ave. under the bridge (800x600).jpg
Previous pageNext page Starting saw cutting Rahway Ave by the Administration building (800x600)
Starting saw cutting Rahway Ave by the Administration building (800x600)